The CPU 1512SP-1 PN is a standard ET 200SP distributed controller with 200 KB program memory, 1 MB data memory and 48 ns bit performance. Its PROFINET IRT interface uses an integrated three-port switch; a SIMATIC Memory Card and BusAdapter for ports 1 and 2 are required.
PN
SYSTEM MATCH
TECHNICAL PROFILE
Configuration Points That Affect Fit
01
Controller class
CPU 1512SP-1 PN
Standard distributed automation controller
02
Program memory
200 KB
Integrated work memory for the user program
03
Data memory
1 MB
Integrated runtime data memory
04
Bit performance
48 ns
Boolean instruction execution value
05
Network interface
PROFINET IRT
Integrated three-port switch
06
Supply
24 V DC; 19.2 to 28.8 V
Reverse-polarity protected input
07
Memory card
Required; up to 32 GB
One SIMATIC Memory Card slot
08
Typical power loss
5.6 W
Plan supply and enclosure temperature
MATCH THE EXACT ORDER CODE
Send clear markings and installed-system details for a focused quote.
Installation, Operation and Commissioning sequence
1
Distributed CPU role
The controller combines S7-1500-class execution with the ET 200SP station format. It manages the local station and PROFINET-connected automation devices.
2
Project and memory
The CPU provides 200 KB program memory and 1 MB data memory. Review block size, communication load, diagnostics and future expansion before selecting it for migration.
3
PROFINET integration
The card uses a CPU 1512SP-1 PN interface. Slot availability, BIOS behavior, operating system support and installed SIMATIC NET components should be checked before replacement.
4
Commissioning sequence
Verify the 24 V supply, memory card, firmware, hardware configuration, PROFINET names, local I/O, communication partners and restart behavior before production release.
SYSTEM RELATIONSHIP
Series Position and Selection Boundary
CPU 1512SP-1 PN
200 KB program / 1 MB data; 48 ns
Standard ET 200SP CPU with PROFINET IRT
CPU 1510SP F-1 PN
300 KB program / 1 MB data; 6 ns
Fail-safe controller with different performance and safety duty
CPU 1512SP F-1 PN
Fail-safe 1512SP variant
Safety role requires an F-project and acceptance
ET 200SP interface module
Remote I/O station connection
No CPU user-program execution
Selection rule: confirm the complete order code, hardware revision, mating components, installed architecture and required behavior before shipment.
AMIKON GLOBAL AUTOMATION SUPPORT
Fast and dependable delivery We help customers obtain current and discontinued automation parts while reducing maintenance delay.
QUALITY | RELIABILITY | TRUST
Availability with accountable service Broad brand coverage, responsive coordination and transparent communication support urgent plant needs.
Customer focus Industrial automation supply Legacy-system support Order tracking Worldwide coordination
Our goal is to keep production moving through careful part matching, efficient delivery and lasting customer relationships built on quality, reliability and honest communication.
MATCH THE EXACT ORDER CODE
Send clear markings and installed-system details for a focused quote.
Contact us within 7 days after receipt if a problem appears. Keep the item in its original condition and state the specific reason. After the returned item is received and checked, an eligible return or replacement can be arranged. Return shipping remains the buyer's responsibility.
BUYER FAQ
Questions Before Ordering 6ES7512-1DK01-0AB0
Q1
Does 6ES7512-1DK01-0AB0 include a memory card?
A SIMATIC Memory Card is required for operation. Confirm the required capacity and whether a prepared card is included in the supply package.
Q2
Can 6ES7512-1DK01-0AB0 replace an F-CPU?
No direct substitution should be assumed. This is a standard CPU; it does not replace a fail-safe controller in a safety architecture.
Q3
Which network hardware is needed for 6ES7512-1DK01-0AB0?
A suitable BusAdapter is required for PROFINET ports 1 and 2. Confirm cable type, topology, port count and IRT requirements.
Q4
What should be checked before loading a project into 6ES7512-1DK01-0AB0?
Confirm CPU order code, hardware state, firmware, TIA Portal compatibility, memory card, device name and the complete station configuration.
Q5
Which acceptance checks suit 6ES7512-1DK01-0AB0?
Test supply recovery, program startup, local I/O, every PROFINET path, communication partners, diagnostics, cycle monitoring and controlled machine operation.